Safety Production Measures of Circulating Fluidized Bed Boiler-High Strength Wear Resistant Castable

Words:[Big][Medium][Small] Mobile Page Two-Dimensional Code 2018-10-15     

Safety Production Measures

1. Safety policy objectives:

1.1 Safety Policy: Safety first, prevention first.

1.2 Safety objectives: A. Eliminate major casualties, serious and minor injuries;

B. Eliminate major mechanical and equipment accidents;

C. Eliminating fire accidents;

D. Attempted accidents caused by the responsibility of control personnel;

E. Strive for the first-class level of safe and civilized construction management.

2. Establishing safety management organizations:

3. Rules and Regulations for Implementation

3.1 Several Provisions on the Investigation and Treatment of Major Liability Accidents.

3.2 Regulations on Safety Construction Management of Electric Power Construction.

3.3 Regulations for the Safety of Electric Power Construction.

3.4 Electric Safety Work Regulations.

3.5 Regulations for the Investigation of Electrical Production Accidents.

3.6 Provincial Detailed Rules for the Implementation of Safety Monitoring Regulations for Lifting Machinery.

3.7 Superior safety regulations.

4. Safety construction management:

4.1 Strictly implement safety construction management regulations and safety construction work rules and regulations, strengthen safety management, implement safety measures to ensure safe construction.

4.2 According to the characteristics of this project, the second project department formulates detailed rules for construction safety management, and clarifies the safety responsibilities of personnel at all levels. Personnel at all levels must conscientiously perform their respective safety responsibilities and implement the safety construction responsibility system with the first responsible person at all levels as the core.

4.3 Strengthen the implementation of three-level safety management education, establish safety files, and strictly implement the "Special Industry Personnel Management Rules".

4.4 Strengthen the propaganda work of construction safety, adopt various forms to carry out regular safety ideological education for construction personnel.

4.5 The Ministry of Engineering regularly organizes major safety inspections, adheres to the system of pre-shift safety meeting once a day, and adheres to the system of group safety activity day once a week.

4.6 Strict implementation of the "Accident Reporting System" for the investigation, analysis and treatment of accidents must be carried out in accordance with the principles of & ldquo; three not let go of & rdquo; and implementation.

4.7 When safety construction is linked to economic responsibility system, the project department should formulate relevant reward and punishment rules according to the (reward and punishment measures for safety management assessment). For individuals who timely discover hidden dangers of accidents, prevent major personal casualties and mechanical equipment accidents, heavy rewards should be given.

4.8 Strictly implement the safety management system for outsourced workers, temporary workers and migrant workers.

5. Safety construction technology measures:

5.1 Accept the supervision and guidance of the safety supervision department of the owner's unit and abide by the safety management system and regulations of the owner's unit.

5.2 Effective isolation of construction area and production operation area. Ensure safe production of power plant.

5.3 Personnel who enter the production area because of work needs are strictly prohibited from touching the equipment in operation or operating standby. No unrelated personnel shall enter the production area.

5.4 When connecting with the system in operation, work tickets must be processed first. After approval, construction shall be carried out according to the stipulated contents of work tickets. If construction is carried out according to the stipulated contents of work tickets, and if the work cannot be completed within the stipulated time of work tickets, the time extension formalities for work tickets shall be handled in advance, and approval shall be obtained. At the end of the work, the work ticket shall be terminated immediately.

5.5 Before the start of each sub-project, construction operation instructions must be compiled. Detailed safety construction measures should be included in the operation instructions. Construction personnel should be informed according to the approved operation instructions. Construction can only be carried out after the implementation of safety measures.

5.6 Measures should be taken to prevent falling objects when working at high altitudes, and effective isolation measures should be taken between layers when working at multi-layers crossover.

5.7 In the important construction scheme, detailed safety construction measures should be approved, the construction personnel should be informed, and the construction can be carried out only after the implementation of safety measures.

5.8 The construction site must have fire fighting facilities and adequate fire fighting equipment.

5.9 Open-fire operation shall be used in areas where open-fire is restricted or fire may occur.

5.10 Sparks in gas cutting and welding should be collected effectively to prevent fire caused by sparks splashing.

5.1l Strictly abide by the fire and explosion safety management system.

5.12 Strictly abide by the system of safe electricity use.

5.13 Strictly abide by the traffic management system. When a motor vehicle is traveling on the highway in the factory area, its speed shall not exceed 20 km/h or run at the specified speed in the factory.

5.14 For the holes on site, there must be protective facilities and clear signs.

5.15 Construction workers entering the site must undergo physical examination. Doctors believe that they are qualified before entering the site for construction.

6. Civilized Construction Management

6.1 Construction workers entering the site must strictly abide by all the rules and regulations of the owner's unit and accept the supervision of the relevant departments of the owner's unit.

6.2 The construction workers entering the site must strictly abide by the civilized construction management system of the factory Department and ensure safe and civilized construction.

6.3 Construction workers entering the site must dress neatly and use correctly labour protection articles according to the stipulated standards. They must not wear shorts, skirts, slippers, high heels, etc.

6.4 Civilization and courtesy should be emphasized. No scribbling should be allowed on the construction site, no interruption between personnel, no drowning in any place, and drowning in designated toilets.

6.5 Care for public facilities.

6.6 Strengthen the management of the general layout of construction. The construction land, material and equipment stacking, construction site and transit site in each region shall be strictly used in accordance with the determination of the general layout.

6.7 The roads at the construction site shall be unblocked, not occupied, and not excavated at will.

6.8 No material, equipment or other articles shall be stacked on the safe passage, and no damage shall be done to the safe passage.

6.9 Material, equipment, materials and equipment in the warehouse should be discharged neatly and clearly marked.

The materials and equipment used in 6.10 Project shall be stacked tidily and firmly on site, and shall not be super high or overloaded in accordance with relevant regulations.

6.1l Temporary Electricity for Field Use