1. Stake out the sub-project according to the drawings and hang the vertical line. The lining is carried out by mechanical vibration or manual smashing, and the castable is stirred according to the ratio.
2. Leave the expansion gap between the parts of the lining and the equipment according to the size and technical requirements of the drawings.